10 X 10 Cabinet Pricing Template

September 20th, 2009

10x10

Stuart Florida Showroom

September 19th, 2009

kitchen

 

Contact us for additional information pgbnh@msn.com

Treasure Coast and Kitchen Cabinets and Renovation process

September 1st, 2009

What is the typical Kitchen Renovation process.

1. Ceate A kitchen design with the intial measure.
2. Select materials (Eco-Friendly) .
3. Plan Check your design.
4. Order Materials.
5. Deliver materials.
6. Demolition.
7. Sub Flooring preperations.
8. Flooring Installation.
9. Plumbing.
10. Electric.
11. Wall preparations.
12. Priming and painting/Wall paper.
13. Locating Appliances and verifying Specs.
14. Cabinet Installations.
15. Counter top template with Sink and faucets on Job site.
16. Countertop fabrications verifying estimated install date.
17, Countertop Installation.
18. Sink and faucet installation.
19. Appliance installation.
20. Backsplash installation.
21. Light fixture installation.
22. Accessories Installations.
23. Door and draw hardware installation.
24. Final coat of paint.
25. Touch up items.

Contact Email

Green_Header_236211456_std